Data Center Construction and Performance Management for a Bank

As a famous domestically listed joint-stock commercial bank, the bank attracts much attention and gain much respect from China’s stock market with its good performance and reputation for integrity.

After years of construction, Rich Cloud Technology has constructed a whole bank network system composed of three network levels – general center, regional center, and end node. Namely, head office as the general center, the branches as the regional center, and the sub-branch outlets as the end node. At present, the construction of Two-Area Three-Center has been completed, and the single point of failure eliminated, while unified planning and adjustment has been conducted for the routing strategy, assurance for quality of service (QoS) and security. Each branch has WAN line to connect with the head office data center, providing high reliability for the running of applications. While gradually improving the network infrastructure, it initiates to focus on improving network functions for practical application.

Rich Cloud Technology has successfully deployed the network load balancing product of a famous manufacturer in its core applications and online banking system, achieving the load balancing of DNS, links and servers. Through intelligent DNS system, the data access disaster tolerance of multi-data center is achieved, and the load balancing of links provides high availability and high reliability for multi-links load balancing, enabling the fastest outbound and inbound access, while the load balancing of server provides load balancing and application acceleration for application system, achieving fast delivery of application systems.

Meanwhile, it adopts the network and application performance management solutions of a famous manufacturer which has leading advantages in the field, which can effectively monitor the response time of various business systems, quickly show the condition of host which has the most network traffic, application protocol or TCP/UDP port number, and help the network administrator to find the root cause of abnormal traffic at the fastest speed. And when the traffic of branch institutions or some sort of business systems exceeds the threshold, the corresponding alarm information will generate. Through traffic monitoring analysis, the network end-to end visibility can be achieved, the business system and traffic be correlated, and the real-time monitoring of business system at traffic levels be conducted so that the network administration is improved to a new height.


Related solutionsApplication Optimization | Application Visibility